Posted on March 25, 2009 by squarebritches
More priming. We still have the 2 kids’ bedrooms and the guest room to prime then the trim carpenter will come in and put that up. The back fill is pretty much done. We will have the porch poured soon. It will be time to hook it all up shortly – water, [...]
Filed under: Uncategorized | Leave a Comment »
Posted on March 22, 2009 by squarebritches
Clay was using the blower to clear the debris out of the house so we could start priming the drywall. The drywall dust was rolling out the windows. It looked like the house was on fire!
Filed under: Uncategorized | Leave a Comment »
Posted on March 20, 2009 by squarebritches
The septic tank has been installed, the back fill has been mostly done and the electric trench has been dug. Clay has been working like a beaver all week! He has been finishing connecting the septic tank to the sewer system in the house and finalizing wiring all those circuits into the breaker [...]
Filed under: Uncategorized | Leave a Comment »
Posted on March 12, 2009 by squarebritches
The bulldozer operator was out on Monday to take care of getting the backfill in place. It sure does change the landscape to take away those huge mounds of dirt that we have become so accustomed to seeing!
As far as the inside goes, we are waiting for drywall mud to dry
Filed under: Uncategorized | Leave a Comment »
Posted on March 9, 2009 by squarebritches
We finally had a beautiful weekend to work in. The house and garage is completely drywalled and mudding has begun. We should be ready to prime and start painting in short order.
Clay and Caleb wanted to play with the drywall stiltz. They did pretty well for first-timers!
Clay and I have packed all [...]
Filed under: Uncategorized | Leave a Comment »
Posted on March 6, 2009 by squarebritches
The drywall is almost done! The crew will start mudding tomorrow.
Filed under: Uncategorized | Leave a Comment »
Posted on March 5, 2009 by squarebritches
It was so exciting to walk into the house and see drywall hanging! It really re-energized my enthusiasm! We did discover that we missed a couple interior walls that needed batting insulation due to the vaulting. We were at the house until almost 9pm trying to get it done so the drywall [...]
Filed under: Uncategorized | Leave a Comment »
Posted on March 3, 2009 by squarebritches
Clay and I finished the batting insulation this weekend. Clay climbed all over the main dormer. He said he felt like a squirrel. I had been down on my knees cutting insulation then up the ladder to hand the batts to Clay a bazillian times, so we were both pretty worn out by the [...]
Filed under: Uncategorized | Leave a Comment »