Inspections

This week we had the electrical and plumbing inspections done. The electrical needs 3 minor alterations and the plumbing passed completely. What a huge relief! Months worth of work all come down to these 2 inspections.

Clay ran the electrical work for the exterior HVAC unit this week too.

I insulated the back side [...]

Rub a dub dub a Kelly in the tub

Clay and Kelly are still taking care of business every evening after work (in the cold).  I caught Kelly finishing the faucet on the kids’ bathtub (I don’t think he really wanted his picture taken but… Ha! Too late!). 
I haven’t been much help during this phase.  I mostly try to stay on top of keeping debris off the [...]

recent odds and ends

The holidays have been a challenge to fit in updating the blog so these are a couple weeks old.   Clay has installed the pex lines for the water supply. We are pretty close to being ready for inspections and drywall – maybe two weeks.  Some of these offer a closer look at [...]