Posted on January 25, 2009 by squarebritches
This week we had the electrical and plumbing inspections done. The electrical needs 3 minor alterations and the plumbing passed completely. What a huge relief! Months worth of work all come down to these 2 inspections.
Clay ran the electrical work for the exterior HVAC unit this week too.
I insulated the back side [...]
Filed under: Uncategorized | Leave a Comment »
Posted on January 12, 2009 by squarebritches
Clay and Kelly are still taking care of business every evening after work (in the cold). I caught Kelly finishing the faucet on the kids’ bathtub (I don’t think he really wanted his picture taken but… Ha! Too late!).
I haven’t been much help during this phase. I mostly try to stay on top of keeping debris off the [...]
Filed under: Uncategorized | Leave a Comment »
Posted on January 5, 2009 by squarebritches
The holidays have been a challenge to fit in updating the blog so these are a couple weeks old. Clay has installed the pex lines for the water supply. We are pretty close to being ready for inspections and drywall – maybe two weeks. Some of these offer a closer look at [...]